Skip to content

Line painting taking place at Hwy. 1A/22 roundabout on May 15

Line painting of the roundabout is scheduled for Wednesday, May 15 through the evening and into the night “The Highway 1A/22 interchange team is aware of ongoing public concern with the faded paint lines,” said the Alberta Transportation
Foothills residents say lines painted on Highway 7 at Big Rock Trail / 16 Street W aren’t enough. The Province is now looking into lights or speed reduction at the busy

Line painting of the roundabout is scheduled for Wednesday, May 15 through the evening and into the night

“The Highway 1A/22 interchange team is aware of ongoing public concern with the faded paint lines,” said the Alberta Transportation and Economic Corridors (TEC) in an advisory released to the public. “Please be assured that we share these concerns and have placed high priority on this issue to be addressed.”

By painting overnight, TEC hopes to minimize traffic disruption.

Residents and visitors of Cochrane can reach the project team at [email protected] or visit alberta.ca if they have any questions.

 

push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks